HANDLING HEAVY LIFT AT DAKRE POWER PLANT, KON TUM
Project location: Kon Plong District, Kon Tum, Viet Nam
Scope of work: Jacking, skidding, trucking & unloading at site
Volume:
– 2 packages (4.5 x 4.26 x 4m): 52 tons/each
– 2 packages (5.83 x 2.29 x 2.69m): 49 tons/each
Year: 2018
Client: Central Hydro Power (EVN CHP) Using hydraulic jacks to jack up cargo
Skidding cargo on railway
Transporting to site
Using excavator to clear access road
Arriving at site
Unloading at site